Skip to the content Skip to the Navigation

  • HOME
  • NEWS
  • ABOUT US
  • OUR WORKS
    • Utilizing Ocean Wind Energy
    • Utilizing of Deep Ocean Water
    • PBCF
    • Other Works
  • ARTICLES & REFERENCES
  • CONTACT

Tohoku Electric Power

  1. HOME
  2. Tohoku Electric Power
wind challenger
2022-02-03 / Last updated : 2022-02-03 oocimaster News

The windsail of the Wind Challenger has been completed

The first hard windsail of the Wind Challenger has been completed at the Oshima Shipbuilding. It will be installed on a bulk carrier and will be sold and operated by MOL, as a specialized vessel for Tohoku Electric Power Co., Inc.. Please refer to the following press release from MOL for photos and more details.

Recent post

Optional
Featured on Yahoo! News on April 28th, 2022
2022-04-29
News
The windsail of the Wind Challenger has been completed
2022-02-03
News
PBCF was recognized by Guinness World Records
2022-01-02
Zero-emission ship demonstration test has successfully completed in Nagasaki (Wind Hunter Project)
2021-12-13
Nominated for Wind Propulsion Innovation Award 2021
2021-10-27
Launching demonstration experiments in Sasebo City in September (The Wind Hunter Project)
2021-09-08

© 2021 Ouchi Ocean Consultant, Inc. All Rights Reserved.

Unauthorized reproduction or duplication of any text, images, or other content on this site is prohibited.

MENU
  • HOME
  • NEWS
  • ABOUT US
  • OUR WORKS
    • Utilizing Ocean Wind Energy
    • Utilizing of Deep Ocean Water
    • PBCF
    • Other Works
  • ARTICLES & REFERENCES
  • CONTACT
PAGE TOP